With this latest addition, Blockware becomes the first customer signed at Dorothy 1B, a 25 MW data center co-located with and powered by the Briscoe Wind Farm. Soluna recently acquired the Briscoe Wind Farm in a $53 million transaction, enabling full vertical integration between its energy generation and data center operations. Across all sites, Blockware's total deployed capacity with Soluna now exceeds 17 MW.