Northland Power Inc. ("Northland") (TSX:NPI) today announced the signing of a long-term Corporate Power Purchase Agreement ("CPPA") with Taiwan Semiconductor Manufacturing Company ("TSMC") for additional power from its Hai Long offshore wind project in Taiwan ("Hai Long" or the "Project").

The Hai Long Project is being constructed by Northland (30.6%) jointly with Mitsui & Co. (40%) and Gentari International Renewables Pte. Ltd (29.4%). The project is located approximately 45 – 70 kilometers off the Changhua coast in the Taiwan Strait and consists of three offshore wind sites, the 294-megawatt (MW) Hai Long 2A, the 224 MW Hai Long 2B, and the 504 MW Hai Long 3 with a combined gross capacity of 1,022 MW.