On Tuesday, Velo3D (NASDAQ:VELO) discussed first-quarter financial results during its earnings call. The full transcript is provided below.

This content is powered by Benzinga APIs. For comprehensive financial data and transcripts, visit https://www.benzinga.com/apis/.

The full earnings call is available at https://event.choruscall.com/mediaframe/webcast.html?webcastid=M8jBWlkj

Summary

Velo3D reported a strong start to 2026 with a 48% year-over-year increase in revenue, driven by growth in defense and aerospace sectors.

The company highlighted the expansion of its Rapid Production Solution (RPS) business, which now accounts for a significant portion of revenue, enhancing long-term customer relationships and profitability.

Gross margin improved to 17%, with expectations for further expansion through the year as production volumes and operating leverage increase.

Velo3D secured several key contracts, including an $11.5 million production contract with a US defense contractor and a $9.8 million contract with the Defense Logistics Agency, strengthening its position in defense manufacturing.

The company maintained a backlog of $30 million, with strong demand across defense and aerospace, and plans to expand manufacturing capacity to support growing demand.

Management reiterated its full-year 2026 revenue guidance of $60 to $70 million, with gross margins expected to exceed 30% in the second half, and aims for EBITDA profitability later in the year.

Velo3D successfully raised $50 million in equity financing post-quarter, enhancing liquidity and supporting strategic growth initiatives.

Full Transcript

OPERATOR

Welcome to Bill the first quarter 2026 earnings call. this time, all participants are in a listen only mode. A question and answer session will follow the formal presentation. If anyone should require operator assistance during the conference, please press Star0 on your telephone keypad. Please note this conference is being recorded. I will now turn the conference over to James Carbonara, Investor Relations. Thank you. You may begin.

James Carbonara (Best of Relations)

Thank you Operator. Good day everyone and welcome to Velo3d's first quarter 2026 earnings call. Before we begin, please note that today's call will contain forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. These statements are subject to risks and uncertainties that could cause actual results to differ materially from those projected. Please refer to our press release issued earlier today as well as our filings with the SEC, including our 2025 Form 10K for a discussion of these risks. We will also reference certain non GAAP financial measures during the call. Reconciliations between GAAP and non GAAP results can be found in today's press release which is available on the Investor Relations section of our website. A replay of this call will also be available shortly after its conclusion. With that, I will turn the call over to our CEO Arun Jaldi. Arun, please go ahead.

Arun Jaldi (Chief Executive Officer)

Good afternoon everyone and thank you for joining Velo3D's first quarter 2026 earnings call. 2026 is off to a strong start for Velo3D. We are seeing accelerating momentum across the business driven by strong execution, expanding customer demand and increasing adoption of additive manufacturing as a true production technology across defense and aerospace markets. In the first quarter, revenue increased 48% year over year reflecting continuous strength across both our defense and commercial aerospace end markets as qualified programs increasingly convert into full scale production activity. We believe this performance underscores the growing strategic importance of our technology and the confidence customers are placing in Velo3D as a long term manufacturing partner. A major highlight this quarter was continued expansion of our Rapid Production Solution or RPS business which now represents an increasingly meaningful portion of total revenue. We believe this evolution is transformational for Velo3D. Unlike traditional one time system sales, RPS creates long duration production relationships with repeat utilization across multiple programs driving greater visibility, stronger customer integration and what we believe will be improved long term economics for the business as adoption accelerates. We believe this mix shift positions us to pursue more durable high quality revenue streams and scalable profitable growth over time. From a profitability standpoint, we delivered positive gross margin of 17% during the quarter, a significant milestone, another strong indicator that the structural improvements we have implemented are taking hold. Gross margin expansion was driven by higher utilization rates, improved manufacturing efficiency, better absorption of fixed costs, and continued operational discipline throughout our production footprint. Importantly, we believe we are still in early innings of this margin expansion story. We expect meaningful continued progress throughout 2026 as production volumes increases, RPS continues to scale and operating leverage improves. Our backlog was approximately $30 million compared to approximately 31 million at year end, reflecting a modest decline while bookings totaled approximately 12 million during the first quarter. Demand trends remain highly encouraging, particularly across defense and aerospace customers pursuing larger scale production deployments. It's important to recognize that bookings can fluctuate from quarter to quarter due to the timing of government procurement cycles and the size of individual production awards. However, the underlying pipeline continues to strengthen significantly and we are seeing growing momentum in both quantity and quality of opportunities entering the funnel. This quarter also included several landmark commercial and defense achievements that we believe further validate Velo3D's growing strategic importance with within advanced manufacturing an announcement in our latest Earnings call in March 2026 we continue to execute on our program with defense contractors supporting the U.S. navy, U.S. army and other defense programs. We had announced in February an $11.5 million full rate production contract from a major US defense prime contractor. This award represents a meaningful step beyond qualification and pilot activity into scale production deployment and reflects increasing confidence in our ability to deliver complex mission critical components reliable and at scale. Also in February, we had announced the Velo3D became the first additive manufacturing vendor qualified for US army ground vehicle applications. We believe the milestones is particularly significant because it establishes a new benchmark for additive manufacturing adoption within defense platforms and further expands our long term opportunities across military sustainment and modernization programs. In March, we also announced that Velo3D was awarded a $9.8 million five year IDIQ contract with the Defense Logistics Agencies supporting the Joint Additive Manufacturing Acceptability, or JAMA Pilot Program. This award is strategically important for several reasons. First, it reinforces Velo3D's growing role within critical defense sustainment initiatives. Second, it validates the strength and reliability of our technology for Michigan critical applications. And third, it positions us at the forefront of the Department of Defense's adoption of additive manufacturing solutions designed to improve readiness, resilience and supply chain flexibility. Collectively, these wins represents more than just contract value. They demonstrate increasing institutional adoption of Velo3D technology across some of the most demanding and strategically important manufacturing environments in the world. More Broadly, we continue to deepen engagement across our customer base. Existing customers are expanding utilization into additional programs while new customers are progressing through evaluation and qualification cycles at an increasing space. We are seeing a growing number of defense Primes and Tier 1 aerospace suppliers Transition from pilot projects into multi system production deployments. This marks an important inflection point for additive manufacturing industry and further validates our belief that the market is increasingly moving from experimentation to scale production adoption. The macro backdrop in defense remains highly favorable. Governments and defense organizations continue prioritizing modernization, domestic manufacturing capabilities, supply chain resilience and faster production timelines. We believe these trends align directly with Velo3D's core strengths and significantly expand our long term opportunity set in aerospace. Demand for complex high performance metal components remain robust. Customers increasingly require advanced manufacturing technologies capable of delivering precision, repeatability and scalability for mission critical applications and we believe Velo3D is well positioned to meet these needs. Importantly, the pipeline itself is evolving. Not only are we seeing more opportunities overall, but we are also seeing larger, more sophisticated production opportunities emerge earlier in the sales cycle. Increasingly, customers are evaluating multi system deployments from outset rather than beginning with single system installations. We view this as a strong indicator of where the industry is headed and of Velo3D's growing role in that transition. To support this growing demand environment, we are actively advancing plans for our next manufacturing capacity expansion. This expansion is expected to meaningfully increase output while also improving operational efficiency through automation, optimized workflows and enhanced throughput capabilities. At the same time, we continue investing strategically in our technology roadmap. Our teams are making meaningful progress across AI driven process optimization, advanced software integration and next generation manufacturing intelligence tools designed to improve consistency, accelerate cycle times and enhance overall system performance. We're also advancing robotics integration initiatives that we believe will further increase scalability and reduce manual intervention across production environments. Together, we expect these capabilities move us closer to our long term vision of fully connected intelligence manufacturing ecosystem. Ultimately, we see a significant opportunity to evolve beyond discrete part production toward a closed loop digital manufacturing platform. The customer can design, validate, optimize and manufacture mission critical parts using real time production intelligence. Overall, the first quarter represents another important step forward in Velo3D's evolution. We believe we're executing against a large and expanding market opportunity driven by defense modernization, industrial reshoring and accelerating adoption of additive manufacturing at production scale. While we are encouraged by our progress, we recognize that execution at scale brings new challenges and we remain focused on managing costs and capital carefully as we grow. We believe Velo3D is playing an increasingly important role in this transformation. Our focus remains clear execute with discipline, scale efficiently, deepen customer relationships and continue investing in technologies and capabilities that will drive long term growth, profitability and shareholder value creation. With that, I'll turn the call over to our CFO Jim Suwa to walk through our financial performance in more detail.

Jim Suwa (Chief Financial Officer)

Thank you Arun we are pleased to start off 2026 with a strong first quarter as revenue growth accelerated and gross margin expanded both on a year over year basis and on a sequential quarter over quarter basis. First quarter 2026 revenue was 13.8 million, up 48% compared to 9.3 million in the year ago quarter. This increase was driven primarily by an increase in the average selling price, an increase in the number of systems sold and an increase In RPS revenue first quarter 2026 revenue also grew 46% sequentially from 9.4 million in the fourth quarter. 2025 gross margin for the first quarter was 17.2% compared to gross margin of 7.5% in the year ago quarter and negative 73.6% in the fourth quarter 2025 we are not only pleased with the gross margin improvement in the first quarter, but we also expect gross margin to improve as RPS scales and new Sapphire XC systems are built to order. Operating expenses for the first quarter were 9.3 million, down from 12.2 million a year ago. On a non GAAP basis excluding 1.2 million of stock based compensation. Operating expenses were 8.1 million, again down compared to 8.8 million in the prior year quarter, demonstrating continued cost discipline without sacrificing revenue growth. GAAP net loss for the quarter was 7 million and improved compared to a net loss of 25 million in the year ago quarter and also improved from a net loss of 21.9 million in the December 2025 quarter. Non GAAP net loss for the quarter was 5.1 million excluding stock based compensation of 1.9 million and an improvement compared to a non GAAP net loss of 9 million in the year ago quarter and also an improvement from a non GAAP net loss of 11.6 million in the December 2025 quarter. Adjusted EBITDA for the first quarter of 2026 improved to negative 3.6 million compared to negative 6.9 million in the first quarter of 2025 and also improved compared to negative 10 million in the December 2025 quarter. As of March 31, 2026, we had a backlog of 30 million, slightly down compared to the 31 million at the end of December 2025 quarter, which was the largest quarterly bookings in company history and up from the 18 million backlog in the first quarter of 2025. Our backlog reflects strong demand across both defense and aerospace programs. Importantly, the composition of our backlog continues to show year over year growth in RPS fueled by strong demand from both the aerospace and defense sectors. Moving on to the balance sheet, we had 16.6 million of cash and cash equivalents as of March 31, 2026, down from 39 million at the end of 2025. We made significant progress on strengthening our balance sheet during the first quarter of 2026 with the completion of debt to equity conversions totaling $15 million, including 5 million converted at a premium to the company's share price on the date of conversion and full repayment of the secured note. As a result, we reduced our outstanding debt by approximately 70% to approximately 9 million subsequent to quarter end and not reported on the March 31, 2026 balance sheet. On April 27, 2026, we further enhanced our financial position through a successful equity financing raising approximately 50 million in gross proceeds through a firm commitment underwritten registered Direct offering. These actions collectively strengthen our liquidity and provide additional flexibility to support ongoing investments in our people, operations and growth initiatives. In summary, our strategy is gaining traction. Employee efforts are translating to positive operating and financial progress and we delivered a strong first quarter posting both revenue growth acceleration and gross margin expansion. With that, I will turn the call back to Arun for a few remarks regarding our outlook for 2026. Thank you.

Arun Jaldi (Chief Executive Officer)

Looking ahead, we continue to expect strong momentum through 2026 as we scale our operations and execute against growing demand across defense and commercial aerospace markets for the full year 2026. We are reiterating our guidance. We expect revenue in the range of 60 to 70 million dollars reflecting continued adoption of our rapid production solutions and expansion of our large format additive manufacturing capabilities across both existing and new programs, we continue to expect sequential improvement in gross margins, with margins projected to exceed 30% in the second half of 2026 as production volumes increase and we realize further operation efficiencies, non GAAP adjusted operating expenses are expected to remain disciplined in the range of 45 to 55 million dollars. As we continue investing selectively to support strategic growth initiatives, capital expenditures are expected to remain in the range of 40 million to 50 million, primarily focused on expanding production capacity, enhancing automation and supporting the scale manufacturing footprint. Subject to the availability of sufficient funding, we continue to expect to achieve EBITDA profitability in the second half of 2026. More broadly, we remain focused on executing the first phase of our long term capacity expansion strategy which envisions a potential scale production network over the next decade to support approximately 400 production systems. The investments we are making in 2026 across manufacturing infrastructure, supply chain optimization and workforce development are foundational to that plan. And we expect to provide periodic updates as we progress against key capacity milestones.

OPERATOR

Thank you. And with that, we will now be conducting a question and answer session. If you would like to ask a question, please press star one on your telephone keypad. The confirmation tone will indicate that your line is in the question queue. You may press star two to remove yourself from the queue. For any participants using speaker equipment, it may be necessary to pick up the handset before pressing the star keys. One moment while we poll for questions. And our first question comes from the line of Jason Schmidt with Lake Street Capital Markets. Please proceed with your question.

Jason Schmidt (Equity Analyst)

Hey guys, thanks for taking my questions. I'm just curious if you could update us on how you're thinking about the ramp of the fleet of printers this year to get to that goal of 40 printers and any update on the expansion plans in California would be helpful. Thank you.

Arun Jaldi (Chief Executive Officer)

Yeah, Jason, thank you for your question. So you're talking about the fleet expansion of 400 in 10 years or I can divide that just, just the expansion this year and how we should think about the ramp of printers. Okay. Currently the facility has about 15 and we are building another 20 machines and we are buying back some of the machines. So that will be 40 plus machines at a full production level. So sequentially we are adding more printers every quarter according to our model. Like we're ramping that more on the third quarter and fourth quarter. And we will finish the bills of 20 plus machines this year. That will put us at 40 plus production machines generating revenue by another year. And the expansion plan we're expanding in California, we finalized one of the sites and we will announce that pretty soon once the paper, I mean the formalities are done from lease aspects. But this expansion within California will host up to 100 machines in that facility. That is phase one of our production which will be completed within two and a half years of start up that new facility. The reason why we selected California is to reduce a lot of burden on our present teams and also reduce the OPEX overall as we grow. Then we'll find out and then find better options to expand in the future. So I hope I answered all your questions.

Jason Schmidt (Equity Analyst)

Yeah, that's helpful. And then on the last Call you mentioned some momentum in munitions programs. Just given the consumable nature of those programs, they seem to be pretty sizable. How should we think about those programs impacting the P and L both this year and 27 and beyond?

Arun Jaldi (Chief Executive Officer)

So most of the contracts we announced, we are hoping to capture all that backlog within 12 months. That's the time period. We have a couple of full production orders this year, which is already been announced in March and January. So that's why the push for building more machines because the capacity is parallel to what we can produce and that increases the RPS revenue. So the speed of building machines dictates how much revenue we can actually capture this year.

Jason Schmidt (Equity Analyst)

Okay, that makes sense. And the last one for me and I'll jump back into Q. What percentage of revenue was RPS in Q1?

Arun Jaldi (Chief Executive Officer)

So it's about 25%.

Jason Schmidt (Equity Analyst)

Thanks a lot, guys. Thank you.

OPERATOR

Thank you. And our next question comes from the line of Troy Jensen with Cancer Fitzgerald, please proceed with your question.

Troy Jensen (Equity Analyst)

Hey gentlemen, congrats on the results here. Maybe just a couple questions on the rps. I mean obviously that's kind of a key story going forward. So what, how much of the backlog with the RPS business? So the 30 million exiting Q1.

Arun Jaldi (Chief Executive Officer)

Yeah. So if you see the announcements, what we have one on the 11.1 that's purely RPS 11.3. And then there is another development program. So you can say half of the backlog is RPS, also about 15 million.

Troy Jensen (Equity Analyst)

Okay. And I guess my question run like getting to the profitability goal in the second half of the year is based on your ability to kind of deploy a lot of machines and drive that RPS revenues. But just thoughts on just capacity utilization as you turn these machines on. Do you have enough bookings right now through the end of the year to get to 40 to drive these 40 plus percent gross margins or just thoughts on utilization of the facility as you scale up.

Arun Jaldi (Chief Executive Officer)

So we are building these machines parallel to what the demand. And all the 40 machines will be fully occupied by end of the year with the programs we have. That's why we are sequentially building. And that is not enough. This is only first quarter. There's more to come in the future. So we are preparing the capacity because we expected very minimal turnaround of these. But it's like 10x what we need as a capacity now. So basically we're trying our best because it's not easy to just stand up everything overnight. This is manufacturing. There's a supply chain and everything is involved. But we're making really good progress. I'm super impressed by my teams, how they're progressing and how they're pushing the limits to get this done. So I would rely totally on capacity. I'm not worried at all about filling those because we have more than enough to fill them.

Troy Jensen (Equity Analyst)

Okay, and then Jim, do you still stand by or endorse the goal of. I think it's EBITDA profitability in the second half of the year?

Jim Suwa (Chief Financial Officer)

Absolutely I do, Troy. And the way to think about it first of all is the past month or so I've been spending a lot of time with our customers and also operations. And our customers keep asking us for more and what more we can do for them and how we can help out them more and more. So this is aligned with the customers and then operationally we see some efficiencies to help out those margins. And then Arun referred to the capacity site expansion that we're diligently working on too. So I absolutely stand behind that guidance.

Troy Jensen (Equity Analyst)

Awesome. All right, guys, keep up the good work.

OPERATOR

Thank you. Thank you. And our next question comes from the line of George Maremma with Pareto Ventures. Please proceed with your question. Good afternoon everyone. Had a couple questions. I was curious what kind of efforts are being made to sort of ease and simplify the processes for third parties using Velo machines in production of scale.

George Maremma (Equity Analyst)

So I mean our field service and

Arun Jaldi (Chief Executive Officer)

so basically going back to most of the platforms and services out there, I mean our systems out there, and just trying to see how we can fulfill our present demand with the capacity we have. So that's being very receptive and we're supporting them on a financial model that actually works for both the customer and us. Okay, you're building a nice snowball with 70% of your orders are repeat orders. Now I'm sort of curious, outside of defense government procurement areas, what other, like what are the top sources and what's the sales and marketing motions to fill top of funnel outside of defense, the production orders. So apart from that, energy and semiconductor is another areas which we are really focused on and we're moving ahead with some of the semiconductors. I mean, you can see the demand. You can correlate the demand with AI chip and data center manufacturing, how they're increasingly in demand of the, you know, the chip manufacturing equipment providers. So that correlates to what Velo does in a future generation semiconductor market. So these two areas are so intensely, getting things done compared to last year. And one other area you want to really focus on is energy because all These requires energy and way of supporting energy requirements for all the infrastructure we are building here on the data side and also the equipment side and defense side. So this is actually a long, long, long duration tailwinds, I would say, which these kind of programs can run up to decades. So that's what I would look forward to on our tailwinds, what we are doing and it's helping us quite tremendously. That's phenomenal. Thanks, Arun. Thank you. Thank you. And with that, there are no further questions at this time. I would like to turn the floor back over to Arun Jody for closing remarks. Thank you everyone for supporting Velo3D and being with us and joining this call. This journey has not been easy.

OPERATOR

There's a lot more to go and I truly appreciate our investors, our suppliers, our employees and everybody involved in this journey. And we look forward to keeping this momentum for the rest of the year and decades to come. Thank you again and have a nice evening. This does conclude today's teleconference. Thank you for your participation. You may disconnect your lines at this time and have a wonderful rest of your evening.

Disclaimer: This transcript is provided for informational purposes only. While we strive for accuracy, there may be errors or omissions in this automated transcription. For official company statements and financial information, please refer to the company's SEC filings and official press releases. Corporate participants' and analysts' statements reflect their views as of the date of this call and are subject to change without notice.