• District-Wide Enrichment Confirmed: sampling across six underground ore bodies and two historic tailings facilities confirmed elevated germanium across the Balmat-Edwards zinc system.
  • Priority Targets Identified:
    • 18.8 million short tons (internal engineering estimate) at Number 4 tailings, with five samples ranging from 18.1 to 31.3 ppm
    • 4.97 million short tons (based on historical mill production records) at Edwards tailings facility, with two samples ranging from 30.1 to 44.7 ppm
    • 600,000 short tons in the current mineral resource estimate at Mud Pond Main, with three samples ranging from 4.5 to 85.6 ppm